Telemetry and power chains showed stable behavior under target load conditions.
The team moved to the next phase with an expanded stress-testing matrix.

Telemetry and power chains showed stable behavior under target load conditions.
The team moved to the next phase with an expanded stress-testing matrix.
Read Next

23 FEB 2026
The task portfolio focuses on platform reliability, miniaturization, and integration speed.
Access Report →
22 FEB 2026
A working session covered joint test roadmap and scale-up scenarios.
Access Report →
20 FEB 2026
The new cohort includes practical modules in AIT, EMC, and operations analytics.
Access Report →