Back to projects

Creation of SBIK Production Infrastructure

Spacecraft Assembly, Integration and Test Complex

Project for creating the SBIK production infrastructure.

Development period
2012-2018

Key units

  • Assembly and functional test unit
  • Thermal-vacuum test unit
  • Vibration test unit

Composition of SBIK production infrastructure

Test domains

  • Electromagnetic compatibility test unit
  • Radio frequency test unit
  • Acoustic test unit

Specialized operations

  • Spacecraft inertia and mass property measurement unit